Why payroll thinks in hundredths, the one-line formula, the full 1–60 chart, and the rounding rules that decide whether the chart helps or hurts you.
Clocks speak in sixtieths; payroll speaks in hundredths. A shift of 7 hours 45 minutes is natural to say as “7:45,” but you cannot multiply 7:45 by an hourly rate until it becomes 7.75 hours. That conversion — minutes divided by 60 — is all that “decimal hours” means, and it sits underneath every digital timesheet, time-clock export and pay stub in the country.
The stakes are small per shift and large per year. Seven minutes is 0.12 hours; priced at $20, that is $2.40. Misround in the same direction on 250 shifts and you have moved $600 — which is why labor law cares about rounding conventions and why workers should know the chart.
Decimal hours = hours + (minutes ÷ 60). Going back: decimal part × 60 = minutes. Four anchors cover most mental math:
Worked example: a shift from 9:07 AM to 5:52 PM is 8 hours 45 minutes = 8 + 45/60 = 8.75 hours. At $18/hour that shift pays 8.75 × $18 = $157.50 before any overtime split. Reverse example: 6.35 hours is 6 hours + 0.35 × 60 = 6 hours 21 minutes.
The standard chart, rounded to two decimals the way payroll systems publish it (the same values our minutes to decimal converter uses):
| Minutes | Decimal | Minutes | Decimal | Minutes | Decimal | Minutes | Decimal |
|---|---|---|---|---|---|---|---|
| 1 | 0.02 | 2 | 0.03 | 3 | 0.05 | 4 | 0.07 |
| 5 | 0.08 | 6 | 0.10 | 7 | 0.12 | 8 | 0.13 |
| 9 | 0.15 | 10 | 0.17 | 11 | 0.18 | 12 | 0.20 |
| 13 | 0.22 | 14 | 0.23 | 15 | 0.25 | 16 | 0.27 |
| 17 | 0.28 | 18 | 0.30 | 19 | 0.32 | 20 | 0.33 |
| 21 | 0.35 | 22 | 0.37 | 23 | 0.38 | 24 | 0.40 |
| 25 | 0.42 | 26 | 0.43 | 27 | 0.45 | 28 | 0.47 |
| 29 | 0.48 | 30 | 0.50 | 31 | 0.52 | 32 | 0.53 |
| 33 | 0.55 | 34 | 0.57 | 35 | 0.58 | 36 | 0.60 |
| 37 | 0.62 | 38 | 0.63 | 39 | 0.65 | 40 | 0.67 |
| 41 | 0.68 | 42 | 0.70 | 43 | 0.72 | 44 | 0.73 |
| 45 | 0.75 | 46 | 0.77 | 47 | 0.78 | 48 | 0.80 |
| 49 | 0.82 | 50 | 0.83 | 51 | 0.85 | 52 | 0.87 |
| 53 | 0.88 | 54 | 0.90 | 55 | 0.92 | 56 | 0.93 |
| 57 | 0.95 | 58 | 0.97 | 59 | 0.98 | 60 | 1.00 |
Two chart quirks worth knowing: the values round to the nearest hundredth, so 7 minutes shows 0.12 (7/60 = 0.1166…) and 59 minutes shows 0.98, not 0.99. And because each day is rounded separately, a week of chart-rounded days can differ from the exact total by a few hundredths — a rounding difference, not an error.
Employers commonly round punches before converting: to the nearest quarter hour (15 minutes), or under the 7-minute rule, where 1–7 minutes past a quarter rounds down and 8–14 rounds up. Federal law permits rounding only when it works out neutrally over time — it may not systematically shave minutes in the employer's favour. Some systems instead convert exact minutes and round only the final pay amount to the cent, which is the most accurate method of all.
If you keep your own log (you should), record exact clock times. You can always apply the chart or a rounding rule later; you can never recover exactness from a log that was rounded as it was written.
Some industries — law firms, consultancies, many healthcare and IT contractors — bill and pay in tenths of an hour: 0.1 = 6 minutes. The tenth chart is short enough to memorize: 6 min = 0.1, 12 = 0.2, 18 = 0.3, 24 = 0.4, 30 = 0.5, 36 = 0.6, 42 = 0.7, 48 = 0.8, 54 = 0.9.
Systems working in tenths usually round each entry to the nearest tenth, so a 4-minute task records as 0.1 (never 0.0 if any time was worked and the system rounds half up) and a 9-minute call as 0.2. The same federal neutrality principle applies as with quarter-hour rounding: rounding must not systematically favour one side. Across a month of small entries, one-directional tenth-rounding moves real money — 3 minutes shaved from 20 entries a week is an hour a month.
If your employer reports in tenths and you log in h:mm, convert with the 6-minute anchors above and expect small, explainable differences of ±0.05 hours per entry. Differences bigger than that, or all leaning one way, are worth a question.
Overtime splits are computed on decimal totals: a week of 42.50 decimal hours at $20 is 40 × $20 + 2.50 × $30 = $875. Breaks convert the same way — an unpaid 30-minute break is 0.50 hours off the day. When you verify a stub, convert each day first, then add the week: stub totals are decimal, and comparing your h:mm notes directly against them is how phantom discrepancies appear.
Every calculator on this site shows both forms side by side — h:mm because humans think that way, decimal because payroll pays that way.
Convert any minutes or h:mm value instantly, with the printable chart.
Free — try itWeekly totals shown in both h:mm and decimal, exactly like a pay stub.
Free — try itThe five entries that matter and the weekly stub check.
Free — try itSee how the 7-minute and quarter-hour rules treat your punches.
Free — try itExplore every Loona Automation site: calculators, PDF, QR, salary, study and Islamic tools — free, no sign-up.
Free — try itDivide the minutes by 60 and add any whole hours. 45 minutes = 0.75 hours; 2 hours 20 minutes = 2.33 hours. The chart on this page covers every minute from 1 to 60.
Because decimals are fractions of an hour, not minutes with a dot: 7 ÷ 60 = 0.1166…, which rounds to 0.12. Writing “7:07” as 7.07 hours is the classic beginner error — 7.07 hours is actually 7 hours and about 4 minutes.
Multiply the decimal part by 60: 0.35 × 60 = 21 minutes, so 0.35 hours is 21 minutes and 6.35 hours is 6 hours 21 minutes.
Fair rounding is neutral over time — it must average out under federal rules. One-directional rounding (always down on clock-in, always down on clock-out length) is not fair rounding and is not allowed.
Record in h:mm (exact clock times) and let payroll convert. If you submit decimals directly, use the standard two-decimal chart so your numbers match the payroll system's.
Add this calculator to your own website or blog — it is completely free, needs no sign-up, and always shows the latest version. Copy the code below and paste it into your page where you want the calculator to appear. Keeping the small “Powered by Loona Automation” credit line under the embed helps keep this tool free — but you are free to style or remove it; the tool works either way.