Plan a 40 hours in fewer than 5 days pattern: hours, overtime and gross pay, worked out for the compressed workweek schedule.
Tick Overnight if the shift ends after midnight (clock-out is next day).
A compressed workweek squeezes 40 hours into fewer days — usually 4 × 10, sometimes 3 × 12 or 9 × 9 with one day off every two weeks (the 9/80 schedule). The appeal is the extra day off; the cost is longer days and, in daily-overtime states, the daily overtime rules.
The 9/80 is the quiet classic: 80 hours over two weeks, with one weekday off every second week — 8 nine-hour days, one 8-hour day, one day off. In federal-rule states it is all straight time; in California it needs an alternative-workweek election.
An engineering firm adopts 9/80. Every second Friday is off, the week is 44 hours in the first week and 36 in the second, and nobody works overtime unless a project deadline demands it.
Yes, with a validly adopted alternative workweek schedule (a two-thirds employee vote). Without it, the daily overtime rule makes 10- and 12-hour days expensive.
80 hours in 9 days over two weeks: eight 9-hour days, one 8-hour day, and one full day off every second week.
Add this calculator to your own website or blog — it is completely free, needs no sign-up, and always shows the latest version. Copy the code below and paste it into your page where you want the calculator to appear. Keeping the small “Powered by Loona Automation” credit line under the embed helps keep this tool free — but you are free to style or remove it; the tool works either way.